An automated building-code and safety audit of the initial insurance carrier scope found eight mandatory International Residential Code and federal workplace safety items omitted from the adjuster worksheet. Submitting these verified code-upgrade line items recovers significant unpaid labor and materials on this single roof replacement before the claim closes. The complete adjuster supplement packet and outreach drafts below are ready to send directly to the desk adjuster today.
| System / Scope Layer | Current State (Production Claim Impact) | Financial & Compliance Impact | Target Fix & Owner |
|---|---|---|---|
| IRC R905 Perimeter & Valley Waterproofing (Production Claim Critical) |
Adjuster scope includes field shingles only and omits eave/rake drip edge, valley/eave ice-and-water membrane, and starter course strips. | Contractor absorbs $2,520+ in mandatory materials and gutter detach labor required to pass municipal roof inspection. | Supplement Desk / Project Manager: Submit IRC R905.2.8.5, R905.2.7.1, and R905.2.8.1 code citations from Tier 3 table to carrier desk adjuster. |
| OSHA 1926.501 Steep-Slope Safety & Ventilation (Production Claim Critical) |
Scope omits steep-slope harness/anchor setup labor and IRC R806.2 balanced ridge ventilation. | Leaves $1,778+ in mandatory safety compliance and attic ventilation hardware unpaid. | Supplement Desk: Attach roof pitch photo and ridge measurement with OSHA 29 CFR 1926.501 citation. |
| Multi-Trade GC Overhead & Profit (10%/10%) (Production Claim Critical) |
Carrier omitted General Contractor O&P despite coordinating roofing, sheet-metal gutters, and interior drywall trades. | Unpaid $1,999.20 project management margin on multi-trade storm restoration. | Estimator: Request full 10% Overhead / 10% Profit release prior to final depreciation invoice. |
| Xactimate Code | Line Item & IRC / OSHA Code Citation | Quantity & Rate | Omitted Recovery | Audit Status |
|---|---|---|---|---|
| RFG DRIP | Drip Edge (Eaves & Rakes) IRC R905.2.8.5 — Mandatory at eaves and gables on all asphalt shingle replacements |
380 LF @ $3.65 / LF | +$1,387.00 | OMITTED BY ADJUSTER — Mandatory Code Upgrade |
| RFG IWS | Ice & Water Shield Membrane (Eaves + Valleys) IRC R905.2.7.1 — Required 24 in. past interior warm wall line + full valley lining |
840 SF @ $2.18 / SF | +$1,831.20 | OMITTED BY ADJUSTER — Mandatory Code Upgrade |
| RFG ASTR | Universal Starter Course Shingle Strip IRC R905.2.8.1 & Manufacturer 130-MPH Wind Warranty Mandate (Cut 3-tab disallowed) |
380 LF @ $2.45 / LF | +$931.00 | INCLUDED AS WASTE ONLY — Separate Line Item Required |
| RFG STEP / FLCH | Step Flashing & Chimney Counter-Flashing Replacement IRC R905.2.8.2 & R905.2.8.3 — Corroded/bent flashing cannot be reused against new cladding |
64 LF + 1 Assy @ $6.40 / LF + $385 | +$794.60 | OMITTED BY ADJUSTER — Code & Water Intrusion Mandate |
| RFG VNTRA | Continuous Shingle-Over Ridge Vent & Balanced Intake IRC R806.2 — Minimum 1/150 net free ventilation area required for attic code compliance |
83 LF @ $11.20 / LF | +$929.60 | OMITTED BY ADJUSTER — IRC R806.2 Ventilation Code |
| SCF HARN / OSHA | Steep-Slope Safety Harness, Tie-Off Anchors & Perimeter Setup (8/12 Pitch) OSHA 29 CFR 1926.501(b)(13) — Fall protection mandatory above 6 ft height |
34.5 SQ @ $24.50 / SQ | +$845.25 | OMITTED BY ADJUSTER — Federal OSHA Safety Mandate |
| GUT D&R | Gutter & Downspout Detach & Reset for Drip Edge Apron Installation IRC R905.2.8.5 — Existing gutters block mechanical fastening of new eave drip edge |
214 LF @ $3.85 / LF | +$823.90 | OMITTED BY ADJUSTER — Required for Code Drip Edge |
| O&P 10/10 | General Contractor Overhead & Profit (10% OH / 10% Profit — 3+ Trades) Multi-Trade Coordination (Roofing, Sheet Metal/Gutter, Interior Drywall/Paint) |
20% Composite @ 10% + 10% | +$1,999.20 | OMITTED BY ADJUSTER — Multi-Trade GC Coordination |
Hey Mike, I ran the initial carrier scope through our building-code check and found eight required items the adjuster left off—attached the one-page breakdown so your team can send it right over.
Hi Mike,
Took a look at the initial insurance scope for the storm replacement job and compared it against the local building code requirements.
What's going on
The ask
Best,
Ryan